Locations
Commercial solar, delivered in and around Manchester.
Delivered hotel systems in Manchester and Widnes, with the wider North West fleet — including the LWC Liverpool depot — a short drive away.
2systems delivered and published as case studies across Manchester & the North West
89kWp+of commercial solar installed in and around Manchester
2–5year payback on commercial solar-plus-battery systems
24hrsto a Quick Quote for your site in Manchester
Delivered near Manchester.
Hotels
Hotel site — Manchester
56.14 kWp delivered — hotel rollout.
Payback 5.2 yrs ROI 21.6% IRR

Hotels
Hotel site — Widnes
32.45 kWp delivered — hotel rollout.
Payback 4.8 yrs ROI 23.4% IRR
Every Novalux install is published as a case study with its delivered figures — see the full UK map.
See the numbers for your site in Manchester.
A Quick Quote with system design, 25-year cashflow and return on investment — free, and subject to nothing.
quick quote in 24hrs · full proposal within 5 days of survey